IT Outsourcing
7 min read
Reading Time: 7 minutes Nobody signs a contract expecting to lose control of their own codebase. It happens slowly, through small conveniences that each made sense at the time, until the day you price out a switch and realize the number is absurd. This is a story about how that dependency gets built, and what it takes to dismantle it. TL;DR Lock-in is operational, not contractual. The clause...